Ambient has substantial and diversified experience in helping clients meet regulatory requirements which span the range of local, state and federal regulations pertaining to air, water, stormwater, wastewater, hazardous materials, solid and hazardous wastes. Our engineering staff applies extensive technical skill in the design, construction, operation and maintenance on various environmental projects. Ambient also provides compliance services to help clients meet industrial occupational health and safety requirements.

Ambient works closely with federal, state and local regulatory agencies to assure client compliance with applicable laws and regulations during all phases of environmental projects. The Ambient team’s solid working relationship with our clients and regulatory representatives has proven to be extremely beneficial for the successful design and implementation of regulatory compliance programs and systems.

We provide service in the following technical areas:

  • Air compliance
  • Water, wastewater and stormwater management
  • Solid and hazardous waste management
  • Environmental engineering
  • Hazardous materials management
  • Occupational safety and health compliance
  • Compliance training
Case Studies
Childrens Hospital

Ambient provided comprehensive services to assist Children’s Hospital Boston (CHB) in complying with the conditions of the sewer use discharge permit issued by MWRA and other related regulatory requirements.
Read Full Study

Electrical Substation Concord, NH

Ambient Engineering provided regulatory compliance and civil engineering services to Public Service of New Hampshire (PSNH) to expand an electrical substation in Concord, New Hampshire. PSNH sought to expand the substation to allow for improved access to existing and proposed equipment
Read Full Study

Electrical Substation Fitzwilliam, NH

Ambient Engineering provided regulatory compliance and civil engineering services to Public Service of New Hampshire (PSNH) to construct an electrical substation in Fitzwilliam, New Hampshire. As part of a regional project referred to as the “Monadnock Region Upgrades”, PSNH planned to construct a new substation to tie its transmission line with two transmission lines owned by National Grid, USA.
Read Full Study

Multimedia Audit (Confidential Client)

A confidential client in southeastern Massachusetts retained Ambient to perform a multi-media environmental compliance audit to assess compliance of hospital activities in the following program areas: RCRA, CWA, CAA, SPCC, TSCA, EPCRA, and UST.
Read Full Study

Regulatory Compliance Template

Read Full Study

Wellesley Restaurant

Ambient was retained to provide LSP services for a release of approximately 150 gallons of fuel oil occurred from a heating oil above-ground storage tank (AST) in Spring 2005. The release was within a ground floor furnace room of a retail store located within a strip mall and adjacent to the ground floor of a restaurant.